Explore by placeOpen map
01India 02State / UT 03District 04City / Block 05Village / Ward 06Street report
18 national pillarsAll problems
01School Theek Karo 02Food & Agriculture 03Water & Sanitation 04Health & Nutrition 05Jobs, MSMEs & Economy 06Governance, Justice & Safety 07Energy, Environment & Climate 08Cities, Housing & Infrastructure 09Transport & Logistics 10Industry & Manufacturing 11Digital, Science & Innovation 12Society, Culture & Quality of Life 13Women Safety, Health & Empowerment 14Defence, Security & Resilience 15Population & Demography 16Finance, Capital & Public Value 17Energy Security & Transition 18Global India & Cooperation
Research and actionUniversity network
01Problems 02Evidence & Research 03Solutions 04Initiatives & Pilots 05Progress 06Ideas & Evidence 07Write an Article 08Global Research Network 09Best in India 10Contribute 11People & Members
WATER SYSTEM 24 OF 30

Water Research & Innovation

Move from laboratory or prototype to validated, maintainable field performance.

01 · PLACE & PROBLEM

Define the service failure before selecting infrastructure.

A prototype does not prove long-term quality, affordability, operator usability or scale.

Negative results and maintenance failures are rarely visible.

Required local context

Record state, district, city/block, village/ward or supply zone; season and date; source or asset; affected users; observed service; measurement or sample method; photo/document where safe; and uncertainty. Never imply 100-metre accuracy unless the evidence genuinely supports it.

02 · ROOT-CAUSE DIRECTION

Test the full source-to-service chain.

01

Short demonstrations

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

02

Trials avoid difficult water quality or conditions

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

03

Research, utility and community incentives differ

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

04

Procurement favours novelty

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

03 · COMPLETE SYSTEM

Components that must work together.

01

Efficiency and low-cost treatment

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

02

Desalination where justified

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

03

Recharge and groundwater

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

04

Flood and drought tools

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

05

Quality sensors and leak reduction

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

06

Recovery and climate-resilient infrastructure

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

04 · INDIA-FIT SOLUTION

Match intervention to hydrogeology, settlement and service capacity.

01

Define field problem and adoption constraint.

02

Test across relevant seasons and water qualities.

03

Publish accuracy, failure, maintenance and full cost.

04

Require independent validation before scale.

Decision checksSafetyWater balanceAffordabilityEquityOperationsEcologyClimate riskAccountability
05 · ROADMAP

Diagnose, protect, pilot, measure and institutionalise.

0–90 DAYS

Verify & protect

Confirm the location, affected users, service chain, immediate health or safety risk, responsible agency and existing evidence.

3–18 MONTHS

Controlled pilot

Run an open district challenge around one measured problem with common evaluation and failure publication.

1–5+ YEARS

Durable system

Fund operations, preventive maintenance, skilled teams, monitoring, public reporting, correction pathways and independent evaluation.

06 · RESULTS

Measure service and outcomes—not assets alone.

KPI 01Validated performanceBaseline · target · actual · unit · source · period · distribution
KPI 02Uptime after supportBaseline · target · actual · unit · source · period · distribution
KPI 03Cost per outcomeBaseline · target · actual · unit · source · period · distribution
KPI 04Independent replicationBaseline · target · actual · unit · source · period · distribution
KPI 05Negative results publishedBaseline · target · actual · unit · source · period · distribution
07 · RISKS & SAFEGUARDS

Water interventions can transfer risk across people, places and time.

  • RiskTechnology hypePrevention · accountable owner · trigger · remedy
  • RiskVendor-led evaluationPrevention · accountable owner · trigger · remedy
  • RiskUnsafe experimentationPrevention · accountable owner · trigger · remedy