Explore by placeOpen map
01India 02State / UT 03District 04City / Block 05Village / Ward 06Street report
18 national pillarsAll problems
01School Theek Karo 02Food & Agriculture 03Water & Sanitation 04Health & Nutrition 05Jobs, MSMEs & Economy 06Governance, Justice & Safety 07Energy, Environment & Climate 08Cities, Housing & Infrastructure 09Transport & Logistics 10Industry & Manufacturing 11Digital, Science & Innovation 12Society, Culture & Quality of Life 13Women Safety, Health & Empowerment 14Defence, Security & Resilience 15Population & Demography 16Finance, Capital & Public Value 17Energy Security & Transition 18Global India & Cooperation
Research and actionUniversity network
01Problems 02Evidence & Research 03Solutions 04Initiatives & Pilots 05Progress 06Ideas & Evidence 07Write an Article 08Global Research Network 09Best in India 10Contribute 11People & Members
WATER SYSTEM 17 OF 30

District Water Security Plan

Turn local water balances and risks into owned, costed and revisable decisions.

01 · PLACE & PROBLEM

Define the service failure before selecting infrastructure.

Generic plans miss basin, aquifer, settlement, crop, industry and climate differences.

Scheme lists do not reveal trade-offs, dependencies or maintenance cost.

Required local context

Record state, district, city/block, village/ward or supply zone; season and date; source or asset; affected users; observed service; measurement or sample method; photo/document where safe; and uncertainty. Never imply 100-metre accuracy unless the evidence genuinely supports it.

02 · ROOT-CAUSE DIRECTION

Test the full source-to-service chain.

01

Planning boundaries do not match water systems

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

02

Departments submit separate project lists

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

03

Future demand and ecology omitted

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

04

No public correction trail

Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.

03 · COMPLETE SYSTEM

Components that must work together.

01

Inventory and risk assessment

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

02

Demand and climate forecast

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

03

Priority setting

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

04

Projects and budgets

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

05

Implementation ownership

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

06

Monitoring and correction

Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.

04 · INDIA-FIT SOLUTION

Match intervention to hydrogeology, settlement and service capacity.

01

Build compatible district and catchment accounts.

02

Publish essential needs, trade-offs and excluded options.

03

Cost capital plus operations and maintenance.

04

Review annually and after major shocks.

Decision checksSafetyWater balanceAffordabilityEquityOperationsEcologyClimate riskAccountability
05 · ROADMAP

Diagnose, protect, pilot, measure and institutionalise.

0–90 DAYS

Verify & protect

Confirm the location, affected users, service chain, immediate health or safety risk, responsible agency and existing evidence.

3–18 MONTHS

Controlled pilot

Produce an open district plan with block-level consultation, a five-year portfolio and funded first-year actions.

1–5+ YEARS

Durable system

Fund operations, preventive maintenance, skilled teams, monitoring, public reporting, correction pathways and independent evaluation.

06 · RESULTS

Measure service and outcomes—not assets alone.

KPI 01Actions with owners/budgetsBaseline · target · actual · unit · source · period · distribution
KPI 02Water balance improvementBaseline · target · actual · unit · source · period · distribution
KPI 03Priority risk reductionBaseline · target · actual · unit · source · period · distribution
KPI 04O&M fundingBaseline · target · actual · unit · source · period · distribution
KPI 05Annual review completionBaseline · target · actual · unit · source · period · distribution
07 · RISKS & SAFEGUARDS

Water interventions can transfer risk across people, places and time.

  • RiskFalse local precisionPrevention · accountable owner · trigger · remedy
  • RiskPolitical project selectionPrevention · accountable owner · trigger · remedy
  • RiskUpstream/downstream conflictPrevention · accountable owner · trigger · remedy