Explore by placeOpen map
01India 02State / UT 03District 04City / Block 05Village / Ward 06Street report
18 national pillarsAll problems
01School Theek Karo 02Food & Agriculture 03Water & Sanitation 04Health & Nutrition 05Jobs, MSMEs & Economy 06Governance, Justice & Safety 07Energy, Environment & Climate 08Cities, Housing & Infrastructure 09Transport & Logistics 10Industry & Manufacturing 11Digital, Science & Innovation 12Society, Culture & Quality of Life 13Women Safety, Health & Empowerment 14Defence, Security & Resilience 15Population & Demography 16Finance, Capital & Public Value 17Energy Security & Transition 18Global India & Cooperation
Research and actionUniversity network
01Problems 02Evidence & Research 03Solutions 04Initiatives & Pilots 05Progress 06Ideas & Evidence 07Write an Article 08Global Research Network 09Best in India 10Contribute 11People & Members
SYSTEM 04 OF 18

Water-Smart Agriculture

Produce more useful output per unit of sustainably available water.

01 · PROBLEM

What must be understood before action?

Micro-irrigation can save water at field level without saving water in the basin if irrigated area or pumping expands.

Crop choice, power incentives, groundwater status and farmer economics determine real water outcomes.

Local evidence rule

Specify state, district, block/village, season, farmer group, land/water context, affected value-chain stage and source date. Do not apply a national average to a field or community.

02 · ROOT-CAUSE DIRECTION

Test competing explanations.

01

No water budget at aquifer/watershed level

Test seasonal source levels, extraction or water accounts, crop demand, access differences and downstream effects.

02

Technology subsidy without operation support

Test use, capability, errors, downtime, repair access, recurring cost, vendor dependence and post-support outcomes.

03

Crop-market signals favour water-intensive choices

Test seasonal source levels, extraction or water accounts, crop demand, access differences and downstream effects.

04

Water quality and reuse safeguards are weak

Test seasonal source levels, extraction or water accounts, crop demand, access differences and downstream effects.

03 · COMPLETE SYSTEM

What this page includes.

01Drip and sprinkler irrigation

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

02Soil-moisture monitoring

Diagnose the actual constraint with representative tests, prevent contamination and re-measure soil function and farm economics across seasons.

03Crop-water planning

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

04Rainwater harvesting

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

05Farm ponds where appropriate

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

06Groundwater monitoring

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

07Water-efficient crops

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

08Safe treated-wastewater reuse

Begin with a local water balance; assess reliability, quality, crop demand, cost, equity and downstream effects—not equipment installed alone.

04 · INDIA-FIT SOLUTION

Build a connected intervention.

01

Create local water accounts before selecting technology.

02

Combine crop choice, scheduling, soil moisture and efficient delivery.

03

Meter or estimate extraction at an appropriate shared scale.

04

Permit treated-water reuse only with crop, pathogen, contaminant and worker-safety standards.

Decision checksFarmer benefitNet costWater/soilJobsSafetyLaw and rightsMarketMaintenance
05 · ROADMAP

Diagnose, pilot and institutionalise.

0–90 DAYS

Baseline and urgent protection

Map the place, affected people, present flow, immediate loss or risk and responsible institution.

3–18 MONTHS

Pilot

Run a watershed water-productivity pilot measuring extraction, yield, income and return flows.

1–5+ YEARS

Durable system

Integrate finance, skills, standards, infrastructure, operations, market, safeguards, review and maintenance.

06 · RESULTS

Measure outcomes, not announcements.

KPI 01Water consumed per unit outputBaseline · target · actual · unit · source · subgroup · date
KPI 02Groundwater trendBaseline · target · actual · unit · source · subgroup · date
KPI 03Irrigation reliabilityBaseline · target · actual · unit · source · subgroup · date
KPI 04Net income per unit waterBaseline · target · actual · unit · source · subgroup · date
KPI 05Reuse-quality complianceBaseline · target · actual · unit · source · subgroup · date
07 · RISKS & SAFEGUARDS

Protect people, ecology and public value.

  • RiskRebound water usePrevention, accountable owner, monitoring and remedy required.
  • RiskUnsafe wastewater exposurePrevention, accountable owner, monitoring and remedy required.
  • RiskFarm ponds increasing evaporation or inequityPrevention, accountable owner, monitoring and remedy required.